Why is the monitoring and controlling phase extremely important to the success of the project

Respuesta :

zdgzr
zdgzr zdgzr
  • 22-01-2020

Answer: It is the only way to ensure that work plan estimates are on track and that early intervention can take place.

Explanation: APEX

Answer Link

Otras preguntas

Differentiate between an organic combustion reaction and an inorganic combustion reaction.
Solve each equation. |x+5|=-3
Solve each equation. |x+5|=-3
Crates of masses 1 kg , 4 kg , and 6 kg are placed in a line on a frictionless table. They remain in contact as they are pushed by a 60 N force applied to the 1
( i only need number one and number 7 ) someone please i’m desperate i have so much work i need done by monday even if you only do one of them it is greatly app
A 16.0 kg canoe moving to the left at 10 m/s makes a head-on collision with a 19.0 kg raft moving to the right at 7.0 m/s. After the collision, the canoe moves
The monthly cost of water use is a linear function of the amount of water used (HCF). The cost for using 16 HCF of water is $39.04, and the cost for using 44 HC
What is the sum of the matrices shown below? 3 6 0 9 5 -2 + 6 0 -8 4 =
A population of 50 foxes in a wildlife preserve doubles in size every 14 years. The function y = 50.2*, where x is the number of 14-year periods, models the pop
( i only need number one and number 7 ) someone please i’m desperate i have so much work i need done by monday even if you only do one of them it is greatly app