kimbrachantel2962 kimbrachantel2962
  • 03-03-2020
  • Computers and Technology
contestada

The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

The function of the eardrum in the middle ear is to
what is a high structure part of a church which has 5 letters
Mini-Project: Cents and the Central Limit Theorem 1. Collect a sample of at least 50 pennies by setting aside all the pennies you receive in change for severa
Simplify the expressions: cot 0 sec 0 A. Sin0 B. Csc0 C. Cos0 D. Cos* 0
how were north american colonies all similar in the 1700s?
in the number 13,407.036 there are two 3's. Explain how the values of the 3's are related.
in the number 13,407.036 there are two 3's. Explain how the values of the 3's are related.
Why is sodium sulphate hemihydrate called as "Plaster of Paris"?
Simplify the expressions: cot 0 sec 0 A. Sin0 B. Csc0 C. Cos0 D. Cos* 0
Simplify the expressions: cot 0 sec 0 A. Sin0 B. Csc0 C. Cos0 D. Cos* 0