A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

how is urbanization related to popular culture as seen in Texas in the 1920s
Mis papeles están en mi _____.
How do finches adapt in the desert
What importance did North Africa hold for conquering states?
Did pope urban the ll leave the crusades
A) 40 B) 38 C) 24 D) 30
Which situation can be represented by this equation? 1 2 12 x + 20 = 32
Larry, a new lawyer at dewey, dewey, and dewey, is under pressure to maximize his billable hours. if he doesn't bill enough hours, he will receive negative perf
The endpoints of AB are A(2, 3) and B(8, 1). The perpendicular bisector of AB is CD, and point C lies on AB . The length of CD is square root of 10 units.
calculate the angular speed of a bicycle wheel that makes 240 rotations in 6 minutes