andrewsanani andrewsanani
  • 14-05-2020
  • Mathematics
contestada

a plumber laying 500 meters of drain pipe required 20 men of working for 10 days . What length in meters would be laid by 50 men in 5 days, if they all work at the same rate?

Respuesta :

davidmedulla5
davidmedulla5 davidmedulla5
  • 14-05-2020

Answer:

500 meters =20men =10days

To get the factor 500/(20*10)= 5/2 meters/day

For 50 men and 5days we don't know the meters

So we go by 50*(5/2)*5 =625meters

Answer Link

Otras preguntas

hhhhhhhhhheeelp !!! give 20 pintos
What of the following is the best theme? A. Batman theme (Danny Elfman) B. Avengers theme (Alan Silvestri) C. Star Wars (John Williams) D. Star Trek (Alexander
why did china remain isolated
Which word means about the same thing as peevish? Question 3 options: irritable depressing ridiculous hateful
What is the image of (2,4) after a reflection over the x-axis?
Explain how ONE specific African region was affected by the spread of Islam in the period circa 1200 to 1450
During physical activity of high intensity, your heart will beat at a percentage of its maximum rate. Which range shows the correct percentages during this type
BRAINLEST: Please help :(
describe transformation given by (x,y) (x, y + 2)
10 POINTS!!!! for the most meaningful message along with a Brainliest