adoflotorres adoflotorres
  • 03-07-2020
  • Computers and Technology
contestada

Which field can be used to track the progress on tasks that a user has created?
Subject
Start Date
Due Date
% Complete

Respuesta :

connerb333 connerb333
  • 08-07-2020
All of these are correct and what Would work best is a % Complete_ at what this would do is show a 0-100 completion rate
Answer Link
babyyyjadee babyyyjadee
  • 30-10-2020
All of them would work but the most efficient one would be % complete
Answer Link

Otras preguntas

solve for x -ax + 2b > 8
write the equation of the line that passes through (2,5) and is perpendicular to Y=(1/2)X-1
what is the slope from point (0 0) to (6 -2)
20 points How does a debit card differ from a credit card? Why are you less likely to incur crushing debt if you use a debit card rather than a credit card?
P varies directly with the square of R. When R is 4, P is 56. Find the value of P when R is 6
Which type of cloud is most likely to produce precipitation? a. nimbostratus b. cirrus c. altocumulus d. cirrostratus?
a healthy 38 year old female patient was examined by her family physician during a routine preventive exam. The patient has no specific problems, but is HIV pos
what is the answer this question?
The area of the triangle is 1560 m2 True False
Scientists have discovered that 99.9% of the gene sequence is shared by all humans a. True b. False