men can do a work in 32 days in how many days will 24 men complete the same work​

Respuesta :

Аноним Аноним
  • 02-12-2020

Answer:

It will take 32/24, or 1 1/3 days, for 24 men to get the job done.

Step-by-step explanation:

Answer Link

Otras preguntas

The pressure within a 5.75L balloon is 2.00 atm. If the volume of the balloon increases to 8.45L, what will the final pressure within the balloon be if the temp
why do living things need nitrogen?
Polished metals have a metallic luster, which means that?
rachel has a collection of 40 stuffed animals . of the stuffed animals 3/8 are bears and 1/5 are dogs the rest are other animals . how many other animals does s
How many counting numbers are between 30 and 65, not including 30 and 65?
Can someone help solve, 3y+6=30-7y
Find the coordinates of point E if C is the midpoint of AE A has the coordinates of (-3,1) C has the coordinates of (-2,-1)
why did some chiefs decide to fight when english colonists moved into their territory?plz help me
If a fair quarter is flipped 3 times . What is the probability of getting exactly three heads? round to the neast thoudsands.
how many hundredths are in 0.5