toniaotieno
toniaotieno toniaotieno
  • 02-01-2021
  • Mathematics
contestada

how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

In the past, human populations were controlled by: A.wolves and coyotes B.disease and famine C.disease and pollution D.producers and consumers
Please help thanks!!
A nurse is helping to prepare a client for discharge following the vaginal birth of a healthy neonate. As part of the discharge plan, the nurse is reviewing how
What is the approximate area of the shaded region?
For an object whose velocity in ft/sec is given by v(t) = sin(t), what is its distance, in feet, travelled on the interval t = 1 to t = 5? 0.45 0.26 2.82 0.
A car travels at a constant speed around a circular track whose radius is 2.9 km. the car goes once around the track in 280 s. what is the magnitude of the cent
A circular piece of glass has a radius of 0.8 meters. The glass sells for $4.60 per square meter. What is the total cost of the circular piece of glass?
How do you solve, not just the answer PLEASE -2r-4=3r+16
Which Amendment changes a government practice?
The most important reason for having food handlers wear hair restraints is to what?