medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Roger works full-time, has a part-time second job, and has started a new consulting company in response to his son's special needs. He seems to be coping with e
To maintain adequate nutrition, animals require dietary access to certain amino acids. An amino acid that is referred to as "nonessential" would be best describ
PLZ HELP NEED THIS REAL FAST DIS QUESTION HARD ILL GIVE 50 POINTS Jaquenline and her four friends went to the the fair. JaQuenline's dad bought each girl a tick
(answer fast and you could get brainliest) In addition to the release of energy from food, another product of cellular respiration is water. This water leaves t
What characteristics are shared by most cells
The mass of 0.125 mol of nitrogen is A 224g B 1.75g C 3.50g D 112g
Keith was diagnosed with HIV infection a few years ago. Recently his doctor diagnosed a tumor in his body. Doctor inferred he is probably suffering from
In which Instance will the body be unable to absorb Vitamins A, D, E, and K?
Owning a swimming pool requires making sure that the pH of the pool water is between 7.0 and 7.6, because it is the optimal pH for
Often, what people wear is a reflection of the climate in which they live, true or false