ddrain550 ddrain550
  • 02-04-2021
  • Physics
contestada

How much work is done on 10.0 c of charge to move it through a potential diffrence of 9.0 v in 10.0s

Respuesta :

pytvaeh123
pytvaeh123 pytvaeh123
  • 02-04-2021
We need more evidence to be provided
Answer Link

Otras preguntas

Why were people from Africa brought to Georgia?
USE A NUMBER LINE TO FIND 8/9 / 8/45.
If ab = 10 and a2 + b2 = 30, what is the value of (a + b)^2?
USE A NUMBER LINE TO FIND 8/9 / 8/45.
A flight instructor charges $50 per lesson, plus an additional fee for the use of his plane. The charge for the use of the plane varies directly with the square
If it takes Mark twice as long to earn $6.00 as it takes Carl to earn $4.00, what is the ratio of Mark’s pay per hour to Carl’s pay per hour?
What are abiotic factors of the enviroment lynx
3x+y=4 2x+y=5 solve using linear combination
What is the slope of any line parallel to the line 8x + 9y = 3 in the standard (x,y) coordinate plane?
A tree was chopped down and cut up in a local forest.The tree changed in shape.What kind of change took place?A.chemical changeB.physical change C.phase changeD