jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

Select the correctly punctuated sentence. Charleses' essay was much too long. Mine, on the other hand, was too short. Charles's essay was much too long. Mine, o
Write an equation of the line that contains the point (5, -7) and is parallel to the line 4x-3y=2
What is 3/7 × 5/6 thanks​
A scientist is studying a sample of matter. The matter has no definite shape or volume, and it can conduct an electric current. The sample is most likely in whi
A 8.60 L tank of nitrogen gas at a pressure of 455 mmHg is connected to an empty tank with a volume of 5.35 L. What is the final pressure in the system after th
Gokul is working in an unorganised sector and his income is more than his sister who is working in an organised sector. Who amongst the two is at an advantageou
Ken and Susan share £20 in the ratio 1:3 Work out how much money each person gets.
Which is an equation for the line shown? A) x = 2 B) y = 2 C) x = -2 D) y = -2
Can someone please explain in detail how to solve radical equations? (1, 2, &10)
what is the difference between linear pair and angles on a straight line ​