karlrey2763 karlrey2763
  • 04-05-2021
  • Physics
contestada

Calculate the work done if a boy lifts a bag of cement 500N to the floor of a lorry 2.5m above the ground

Respuesta :

hamzaahmeds
hamzaahmeds hamzaahmeds
  • 05-05-2021

Answer:

W = 1250 J = 1.25 KJ

Explanation:

The work done by the boy is due to the change in the position of the cement vertically. Hence, the work done in this case will be equal to the potential energy of the cement:

[tex]W = P.E\\W = mgh[/tex]

where,

W = Work done = ?

mg = W = weight of cement = 500 N

h = height covered = 2.5 m

Therefore,

[tex]W = (500\ N)(2.5\ m)[/tex]

W = 1250 J = 1.25 KJ

Answer Link

Otras preguntas

A company reports the following income statement and balance sheet information for the current year: Net income $424,000 Interest expense 80,000 Average total
Please answer the question in the photo "What is the value of x in the figure?" (x+10) ------------------ 30
Solve by Substitution y=2x+1 2x-3y =21 Show all work. Identify the solution. Solve by Elimination 2x+3y=11 4x-3y=-23 Show all work. Identify the solution.
Which inequality shows all possible values for the measure of the third side, x, in inches?
ta_e_n6 letters word​
1/4 + 3/8 Reduce your Answer to the lowest term? ​
please answer its due tomorrow ill give brainiest no links or scam
What does this even say?
What is the correct answer
If completing a Di-hydrid cross of the traits of vision and height, nearsightedness (N) is dominant over normal vision (n) and short stature (S) is dominant ove