What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Select all that apply. The Russian Revolution of 1905 had its roots in _____. -World War I -Russo-Japanese War -the discovery of vast oil fields -economic and p
Why do France colonize into the new world?
Who can tell me what world war || means
Which of these excerpts from Homer’s Iliad contains an epic simile? As wasps, provoked by children in their play, Pour from their mansions by the broad highway,
What is the mean to a math problem
Solve for y: -y+6+6y=9
Why did Albert Einstein leave Germany? A. because his scientific experiments were continually disproved B. because he was a member of the then out-of-power N
How does the sun cause wind?
What were the two main areas of dispute between Russia and Japan during the Russo-Japanese War? Korea Manchuria China Siberia
What is the answer for N+4=6