maddiebraverman5481 maddiebraverman5481
  • 04-01-2022
  • SAT
contestada

If 24 electricians can wire some new houses in 15 days, how many electricians would be required to do the job in 12 days?.

Respuesta :

shishirshrestha989
shishirshrestha989 shishirshrestha989
  • 04-01-2022

Answer:

here,

electrician/days

24 - 15

x(let). -12

direct proportion,

then,

exchange X up 24 down

or,24*15=12*X

or,24*15divided by 12=X

X=30

hence,30 electrician required to do complete in 12 days

Answer Link

Otras preguntas

Which one has no solution 7x-3=4 2/3x=X-5 3x-2=3x-2 I can’t figure it out
-5 + x =3 solve for x PLEASE HELP ME ASAP
4. Ademas de los espanoles, quienes mas imigraron a la Florida? you can answer in english if it’s easier for you thanks!!
can you please help me ​
what are the common factors of 4 and 6​
The sum of two numbers is -31. One number is 83 less than the other. Find the numbers
Lear The Latin suffix, "ant", used in "defendant", "contestant", and "applicant", means
When sizes of pizzas are quoted in inches, the number quoted is the diameter of the pizza. A restaurant advertises an 8-inch “personal pizza.” If this 8-inch pi
A few mold spores land on the skin but do not survive due to the lack of moisture and the presence of oxygen. These spores have been prevented from harming the
Identificar si las siguientes funciones son: lineal, afín o ninguna: f(x)= –2x+6 f(x)= 9+ 4x² f(x)=2x-1