sadikshyapoudel015
sadikshyapoudel015 sadikshyapoudel015
  • 03-02-2022
  • Mathematics
contestada

a piece of work can be finished in 8 days, what part of the work is done in 2 days​

Respuesta :

kaseyafa
kaseyafa kaseyafa
  • 03-02-2022

Answer:

1/4 of the work

Step-by-step explanation:

A quarter (1/4) of the work is done in 2 days. Let's break it down:

Work can be finished in 8 days total so with 2 days it is only partially completed. If we set it up as 2/8 we can simplify to get 1/4. Therefore, we know only a quarter of the work is done so far.

Answer Link

Otras preguntas

Why was Persephone not permitted to leave Hades permanently?
The Ahmed family have signed a contract to buy the Miller family's home. However, the contract states the Ahmeds must first close on the sale of their current h
Calculate for the following electrochemical cell at 25°C, Pt H2(g) (1.0 atm) H (0.010 M || Ag (0.020 M) Ag if E (H) - +0.000 V and E(Ag)-0.799 V. a. +0.817 V b.
Write the equation of a line containing the point (-4, 6) and parallel to 3x - 2y =8.
What is the log of 1 x 10^23?
- 2/3 + 4/3 I don’t remember how to add fractions
A study finds that people who drink at least two cups of green tea daily have a relative risk of 0.85 of developing heart disease compared to those who do not d
Determine the number of Hamilton circuits in a complete graph with the following number of vertices. 14
An astronaut drops a rock from the top of a crater on the moon. When the rock is halfway down to the bottom of the crater, its speed is what fraction of its fin
What is the isotope with 26 protons, 32 neutrons, and 26 eletrons?