An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

If granola costs $2.20 per pound, how much does 0.8 pound of granola cost???
Calculate the pH at 25 degree Celsius of a 0.19M solution of potassium cyanide (KCN). Note that hydrocyanic acid (HCN) is a weak acid with a pKa of 9.21. Round
On which income group do retailers and manufacturers currently focus? lower-middle income group high-income group low-income group middle-income group
Write an equation for a line parallel to y=2x-2 and passing through the point (1,1) Y=???? PLEASE HELP ANYONE
What were the effects of the Neolithic Revolution? Check all that apply
What were the houses of New England like
Name three of the major ocean basins on earth
Question 1 a chemist dissolves 154.mg of pure hydrochloric acid in enough water to make up 170.ml of solution. calculate the ph of the solution. be sure your an
Which value shows written as a percent? A. 87.5% B. 0.875% C. 875% D. 8.75%
"what was the first stop to hitler?" how did it affect later events?