pieman33333 pieman33333
  • 04-04-2018
  • Mathematics
contestada

Three workers can do a job in 28 hours. How many more workers are needed to do this job in 12 hours?

Respuesta :

MrRamon
MrRamon MrRamon
  • 13-04-2018
4 additional workers for 7 total workers.
if it takes 3 workers 28 hours to do work there are 84 total hours of work (3*28=84) to find how many workers it will take to get the work done in 12 hours divide 84 by 12. 84/12= 7 total workers. 7-3= 4 additional workers needed.
Answer Link
pranilraichura
pranilraichura pranilraichura
  • 08-03-2020

Answer:

4 workers

Step-by-step explanation:

Answer Link

Otras preguntas

If α and β are the zeros of quadratic polynomial x2 + 3x - 2, find the value of α3 + β3.
What is the total number of hydrogen atoms in a molecule of heptyne?
What is the rhyme scheme of the second stanza of Robert Frost's poem?
Urbanization is best described as the _____
Dan bought four candy bars for a total $24.96. How much did each candy bar cost? Thank you
I = $18, P = $200, 118 months find the annuanl interest rate​
Need help with the photo above. No work needed. Just the answer. Thank you
Find the probability of 1: choosing a yellow marble from a bag that contains 6 yellow marbles and 8 red marbles, and 2: flipping a coin and it showing heads.
When Allison Logue found out her children were allergic to corn, she started looking for sweets and starches that were corn-free and was dismayed to find very f
Evaluate f(x) = –4x – 5 for x = –1. –9 –1 4 1