cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

What numbers add up to -5 and multiply to get -90
Does the equator cross the northern or southern part of South America? South America is located mostly in which two hemispheres?
What was the original goal of the Framers when they met at Independence Hall?  How did that goal change?
WRITE EACH RATE AS UNIT RATE. 162 WATER BOTTLE IN 9 CASES=
Is there DNA in our food? How do you know?
Express 230 in scientific notation
this gas makes up close to one fourth of the air surrounding earth
If the diameter of a circle is half of a yard, then its radius is how many inches?
What is 258/300 written as a decimal and a percent???
Simplify the expression. [90 – (12 + 13)](15 ÷ 3)