tatianamcknigh tatianamcknigh
  • 02-05-2018
  • Mathematics
contestada

Joe can put up a swing set in 3 hours. Andy can put up a swing set in 5 hours. How long would it take Joe and Andy to put a swing set up if they worked together?

Respuesta :

Аноним Аноним
  • 02-05-2018
Joe = 3 hours

Andy = 5 hours

If they do it together, time needed = (3 x 5) / ( 3 + 5) = 15/8 = 1 7/8 hours.

Answer: 1 7/8 hour
Answer Link

Otras preguntas

What is 0.03703704 as a fraction
toussaint L'Overtture led a revolt that eventually resulted in independence for what country
what does a ballad consist of?
how do you find an unknown length in similar figure pairs
a company charges $46 for cable TV installation and $21 per month for basic cable service. Write an algebraic expression to represent the total cost of m months
One purpose of the Marshall Plan of 1948 was to (A) rebuild European economies to make communism less appealing (B) aid the depressed agricultural economies of
there are 5 times as many yellow labs as terriers in the dog park. if there are a totsl of 18 dogs , how many dogs are terriers? how would I draw a model an d w
When Mendel crossed two hybrid plants for stem height (Tt), what results did he always get?
what are the constants of t-shirts
How do you write 6,007,200 in expanded form